© 2012-16 |  Privacy Policy

ENTELEN

CONTACT INFO

8707 Sandy Parkway, Sandy, UT 84070

Telephone:   801.542.8090

Fax:              801.559.0111 / 801.542.8093

E-mail:          agent@entelen.com

Utah Contractors License #4548882-5501

Nevada Contractor's License #0076913

Design-Build, LLC

 801.542.8090 x100

 Request a Free Quote!

CHECK  OUT  STEVE'S  LINKS!

SOLAR PANELS

JACK HAMMER

Mormon Detective

DIMPLE DELL RECREATION CENTER

RENOVATIONS AND BUILDING ADDITIONS

PARKER EPS NEW LOADING DOCK

LACO TECHNOLOGIES NEW WAREHOUSE

ENTELEN built a new office and school entry, and remodeled (8) eight classrooms, restrooms and hallways for this project in Davis School District.

The school remained occupied during construction...

Built in 1904 for the Salt Lake Engineering Works,

the building was used primarily as a workshop and warehouse until the early 1980’s. Bogue Associates, LLC / FFKR Architects purchased the building...

The Daughters of Utah Pioneers Museum required extensive electrical upgrades, lighting repairs and interior finish repairs. One of the difficulties with doing such a project was that the museum need to stay...

ENTELEN provided design and construction services for this 26,000 sf manufacturing and office building in Salt Lake City. LACO is a manufacturer of specialty leak detection testing equipment...

The existing loading dock at the Parker facility in

Salt Lake City was not functional and did not fit with planned renovation and expansion inside the warehouse area. ENTELEN provided design-build...

The project, a Lump Sum construction contract with Salt Lake County, includes a dance and exercise room addition to the existing facility Sandy. The project required building next to an occupied...

The Eagle Mountain Fire Station at the Ranches desired an addition of new living quarters, exercise facilities and day room to their existing fire station bays. ENTELEN provided general construction...

Salt Lake County Redwood Rec Center was in need of

some major interior and HVAC systems renovations. ENTELEN, working from designs by MHTN Architects, remodeled locker rooms, the main lobby...

TAYLOR ELEMENTARY ADDITION AND REMODEL

BOGUE BUILDING RENOVATION

DAUGHTERS OF UTAH PIONEERS MUSEUM

EAGLE MOUNTAIN FIRE STATION ADDITION

REDWOOD REC CENTER RENOVATION

RIVERTON CHEVROLET IMAGE UPGRADE

Riverton Chevrolet desired to upgrade their existing facility in the Auto Mall located in Sandy, UT while staying in operation. Strict corporate guidelines

and reviews of design by GM in order to...

 
X

Enter Password:

Wrong password.